| IDB |
BLACK DRAIN DB |
RAWCLIFFE PUMPING
STATION |
01-Nov-05
|
| |
Location: |
PROPERTIES WITHIN THE MOORENDS AND THORNE
AREA. |
Location (EA Region): |
Yorkshire |
|
| |
Location (Council): |
Doncaster Borough Council |
Watercourse: |
BLACK DRAIN |
|
| |
Date work started: |
01-Feb-2006 |
Est. work completion: |
01-Jul-2006 |
|
| |
Description: |
CONSTRUCTION OF 1m3/SEC PUMPING
STATION TOGETHER WITH 1.5KM OF CHANNEL IMPROVEMENTS. |
|
| IDB |
ANCHOLME IDB |
WORLABY PUMPING STATION
REFURBISHMENT |
27-Oct-05
|
| |
Location: |
Northern part of Brigg |
Location (EA Region): |
Anglia, Lincolnshire |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
Watercourse: |
Worlaby pumped drainage |
|
| |
Date work started: |
01-Feb-2006 |
Est. work completion: |
01-Mar-2007 |
|
| |
Description: |
Refurbishment of pumping
station and syphons |
|
| LA |
Wyre
Borough Council |
CLEVELEYS NORTH
PROMENADE AND JUBILEE GARDENS |
24-Oct-05
|
| |
Location: |
SECTIONS 1,2&3 OF CLEVELEYS PROMENADE
FRONTAGE. |
Location (EA Region): |
North West |
|
| |
Location (Council): |
Wyre Borough Council |
Watercourse: |
IRISH SEA |
|
| |
Date work started: |
04-Nov-2005 |
Est. work completion: |
03-Nov-2007 |
|
| |
Description: |
WYRE BOROUGH COUNCIL PROPOSE
CONSTRUCTING A NEW CONCRETE STEPPED COASTAL DEFENCE WITH PROMENADE AND FLOOD
WALLS TO DIRECTLY PROTECT OVER 5,000 PROPERTIES. WORKS ARE PLANNED TO COMMENCE
IN NOVEMBER 2005 FOR A PERIOD OF TWO YEARS. |
|
| LA |
Poole Borough
Council |
POOLE BEACH RECHARGE
SCHEME |
03-Oct-05
|
| |
Location: |
Poole |
Location (EA Region): |
Wessex, Avon and Dorset |
|
| |
Location (Council): |
Poole Borough Council |
Watercourse: |
Open sea coast |
|
| |
Date work started: |
24-Oct-2005 |
Est. work completion: |
13-Mar-2006 |
|
| |
Description: |
Beach recharge using dredged
material from the navigation dredging of Poole harbour. |
|
| LA |
Bournemouth
Borough Council |
BOURNEMOUTH BEACH
RECHARGE SCHEME (BIS4) |
03-Oct-05
|
| |
Location: |
Bournemouth |
Location (EA Region): |
Wessex, Avon and Dorset |
|
| |
Location (Council): |
Bournemouth Borough Council |
Watercourse: |
Open Sea Coast |
|
| |
Date work started: |
24-Oct-2005 |
Est. work completion: |
01-Mar-2010 |
|
| |
Description: |
Beach recharge to the
Bournemouth frontage totalling 1,320, 000 cuubic metres of sand and shingle.
Using dredged material from Poole harbour and balance from a commercial source.
Also includes 3 annual top ups and minor groyne raising. |
|
| LA |
Wansbeck District
Council |
LYNEMOUTH POWER STATION
REVETMENT EXTENSION |
21-Sep-05
|
| |
Location: |
Lynemouth / Wansbeck |
Location (EA Region): |
Northumbria |
|
| |
Location (Council): |
Wansbeck District Council |
|
|
|
| |
Date work started: |
03-Apr-2005 |
Est. work completion: |
25-Mar-2006 |
|
| |
Description: |
The project comprises
excavation of the northern arm of existing revetment and reusing with imported
rock in an extension to the north west around the coal stocking area. |
|
| LA |
Purbeck District
Council |
SWANAGE BEACH RECHARGE
SCHEME |
20-Sep-05
|
| |
Location: |
Swanage |
Location (EA Region): |
Wessex, Avon and Dorset |
|
| |
Location (Council): |
Purbeck District Council |
|
|
|
| |
Date work started: |
19-Sep-2005 |
Est. work completion: |
02-Jun-2006 |
|
| |
Description: |
Coast protection scheme for the
town of Swanage in Dorset. Comprising replacement of derelict timber groyne
field with new timber groynes and associated beach recharge. |
|
| IDB |
LANEHAM IDB |
BOLE INGS PS
REFURBISHMENT & REMEDIAL WORKS TO SAUNDBY BECK |
20-Sep-05
|
| |
Location: |
Hamlet of Bole near Gainsborough |
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
Nottinghamshire County Council |
Watercourse: |
Bole Ings Approach Drain |
|
| |
Date work started: |
23-Jan-2006 |
Est. work completion: |
01-Nov-2006 |
|
| |
Description: |
Refurbishment of Pumping
Station including new pumps, control house/panel, weedscreen cleaner and
reconstruction of Saundby Beck southern embankmentbank |
|
| IDB |
SCUNTHORPE IDB |
BURRINGHAM PUMPING
STATION REFURBISHMENT |
18-Jul-05
|
| |
Location: |
Burringham, west of Scunthorpe |
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
Watercourse: |
Healey's Drain, Carr Dyke N & S |
|
| |
Date work started: |
12-Nov-2005 |
Est. work completion: |
31-Dec-2006 |
|
| |
Description: |
Refurbishment of pumping
station including the provision of two new pumps, control panel, weedscreen
cleaner and refurbishment of further three pumps. |
|
| IDB |
MIDDLE FEN & MERE
IDB |
PRICKWILLOW/OVERFALL
CATCHMENTS IMPROVEMENT WORKS |
04-Jul-05
|
| |
Location: |
Prickwillow; rural area east of Ely |
Location (EA Region): |
Anglia, Great Ouse |
|
| |
Location (Council): |
East Cambridgeshire District Council |
Watercourse: |
Middle Fen Drain |
|
| |
Date work started: |
05-Dec-2005 |
Est. work completion: |
05-Jun-2006 |
|
| |
Description: |
Improvement works to
Prickwillow PS together with the reinstatement of Overfall PS |
|
| IDB |
BEDFORDSHIRE & RIVER IVEL
IDB |
GREAT BARFORD FLOOD
ALLEVIATION SCHEME |
01-Jul-05
|
| |
Location: |
Great Barford, near Bedford |
Location (EA Region): |
Anglia, Great Ouse |
|
| |
Location (Council): |
Mid Bedfordshire District Council |
Watercourse: |
B7 & B13 |
|
| |
Date work started: |
22-Aug-2005 |
Est. work completion: |
30-Sep-2006 |
|
| |
Description: |
Provision of flood storage to
two watercourses |
|
| IDB |
MILDENHALL
IDB |
ALDER FEN PUMPING
STATION IMPROVEMENT WORKS |
28-Jun-05
|
| |
Location: |
Rural area nr Mildenhall |
Location (EA Region): |
Anglia, Great Ouse |
|
| |
Location (Council): |
FOREST HEATH DISTRICT COUNCIL |
Watercourse: |
Alder Engine Drain |
|
| |
Date work started: |
05-Dec-2005 |
Est. work completion: |
05-Jun-2006 |
|
| |
Description: |
Replacement of old, obsolete
diesel pump with 2 modern electric pumps |
|
| LA |
Waveney District
Council |
SOUTHWOLD COASTAL
FRONTAGE SCHEME |
27-Jun-05
|
| |
Location: |
Southwold & Reydon |
Location (EA Region): |
Anglia, Norfolk and Suffolk |
|
| |
Location (Council): |
Waveney District Council |
|
|
|
| |
Date work started: |
14-Nov-2005 |
Est. work completion: |
30-Jun-2006 |
|
| |
Description: |
Construction of groynes and
beach recharge to coastal frontage, together with raising of existing earth
embankment to prevent "back door" flooding |
|
| LA |
Canterbury
City Council |
WHITSTABLE COAST
PROTECTION SCHEME |
24-Jun-05
|
| |
Location: |
SEASALTER AND WHITSTABLE AREAS |
Location (EA Region): |
Southern, Kent |
|
| |
Location (Council): |
Canterbury City Council |
|
|
|
| |
Date work started: |
01-Apr-2005 |
Est. work completion: |
31-Mar-2008 |
|
| |
Description: |
Coast Protection Works
comprising the construction of 49 new timber groynes, raising / lengthening of
existing groynes, beach replenishment of 75,000m3 of shingle, works to existing
seawall, reconstruction of Harbour Quay. |
|
| LA |
West Somerset District
Council |
WATCHET TIDAL CULVERT
REPAIRS |
26-May-05
|
| |
Location: |
Watchet |
Location (EA Region): |
South West |
|
| |
Location (Council): |
West Somerset District Council |
Watercourse: |
Washford River |
|
| |
Date work started: |
20-Jul-2005 |
Date work completed: |
29-Jul-2005 |
|
| |
Description: |
Rehabilitation works to the
Tidal Culvert. |
|
| IDB |
The Parrett
IDB |
CURRY & HAY MOORS
WATER LEVEL MANAGEMENT IMPROVEMENTS |
26-May-05
|
| |
Location: |
Sedgemoor District |
Location (EA Region): |
Wessex, Somerset |
|
| |
Location (Council): |
Sedgemoor District Council |
Watercourse: |
Lower River Tone |
|
| |
Date work started: |
01-Apr-2005 |
Est. work completion: |
01-Nov-2005 |
|
| |
Description: |
Replace 5 exisitng stop log
structures with tilting weirs, construct 3 additional tilting weirs and 1
penstock structureand take into view 350m of ordinary watercourse. |
|
| LA |
New Forest District
Council |
HURST SPIT BEACH
MANAGEMENT |
16-May-05
|
| |
Location: |
Lymington/keyhaven Hampshire |
Location (EA Region): |
Southern, Hampshire & Isle of
Wight |
|
| |
Location (Council): |
New Forest District Council |
Watercourse: |
NA |
|
| |
Date work started: |
01-Dec-2004 |
Est. work completion: |
31-Mar-2006 |
|
| |
Description: |
Continuation of beach
management plan, works including recycling |
|
| LA |
East Devon District
Council |
SEATON WEST - CHECK
HOUSE SEA WALL |
16-May-05
|
| |
Location: |
seaton |
Location (EA Region): |
South West, Devon |
|
| |
Location (Council): |
East Devon District Council |
|
|
|
| |
Date work started: |
03-Oct-2005 |
Date work completed: |
26-Nov-2005 |
|
| |
Description: |
refurbishment of existing
seawall protecting three properties |
|
| IDB |
SOUTH HOLLAND IDB |
PUMPING STATIONS -
ELECTRICAL REFURBISHMENT SCHEME |
12-May-05
|
| |
Location: |
Spalding and villages to east |
Location (EA Region): |
Anglia, Welland and Nene |
|
| |
Location (Council): |
South Holland District Council |
Watercourse: |
Various pumped watercourses |
|
| |
Date work started: |
23-May-2005 |
Est. work completion: |
01-Mar-2007 |
|
| |
Description: |
Electrical refurbishment of
pumping stations |
|
| IDB |
MARKET WEIGHTON
DB |
OXMARDYKE PUMPING
STATION REFURBISHMENT |
19-Apr-05
|
| |
Location: |
CATCHMENT AREA OF MARKET WEIGHTON IDB |
Location (EA Region): |
Yorkshire |
|
| |
Location (Council): |
East Riding of Yorkshire |
Watercourse: |
TEMPLE DAM DRAIN |
|
| |
Date work started: |
11-Aug-2004 |
Est. work completion: |
30-Jun-2006 |
|
| |
Description: |
REFURBISHMENT OF LAND DRAINAGE
PUMPING STATION, REPLACEMENT OF PUMPS AND IMPROVEMENTS TO THE SITE ACCESS. |
|
| LA |
Blackpool Borough
Council |
BLACKPOOL CENTRAL AREA
COAST PROTECTION |
31-Mar-05
|
| |
Location: |
Blackpool |
Location (EA Region): |
North West |
|
| |
Location (Council): |
Blackpool Borough Council |
|
|
|
| |
Date work started: |
30-May-2005 |
Est. work completion: |
01-Jul-2009 |
|
| |
Description: |
construction of new coastal
defence to replace existing that is at the end of serviceable life. Consists of
stepped concrete revetment, sea wall and set back wall |
|
| IDB |
WELLAND AND DEEPINGS
IDB |
PINCHBECK MARSH PUMPING
STATION REFURBISHMENT |
22-Mar-05
|
| |
Location: |
Pinchbeck |
Location (EA Region): |
Anglia, Welland and Nene |
|
| |
Location (Council): |
South Holland District Council |
Watercourse: |
Blue Gowt and tributaries |
|
| |
Date work started: |
11-May-2005 |
Est. work completion: |
31-Mar-2007 |
|
| |
Description: |
Refurbishment of electric
motors and grease pumps, replacement of electric control panels and associated
wiring. New weedscreen cleaner, channel works and control structures |
|
| IDB |
NORTH LEVEL
IDB |
WILLOW HOLT PS
REFURBISHMENT |
21-Mar-05
|
| |
Location: |
Rural area near Gorefield |
Location (EA Region): |
Anglia, Welland and Nene |
|
| |
Location (Council): |
Fenland District Council |
Watercourse: |
Willow Holt Main Drain |
|
| |
Date work started: |
13-May-2005 |
Date work completed: |
20-Dec-2005 |
|
| |
Description: |
Refurbishment of pumps and
motors. Replacement of electrical control panels |
|
| IDB |
BENWICK
IDB |
BROADALLS PUMPING
STATION |
18-Mar-05
|
| |
Location: |
Village of Benwick |
Location (EA Region): |
Anglia, Welland and Nene |
|
| |
Location (Council): |
Fenland District Council |
|
|
|
| |
Date work started: |
01-Oct-2004 |
Date work completed: |
31-Dec-2004 |
|
| |
Description: |
Pump replacement |
|
| IDB |
Isle of Axholme
IDB |
HEALTH AND SAFETY WORKS
AT PUMPING STATIONS |
15-Mar-05
|
| |
|
|
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
|
|
|
| |
Date work started: |
04-Apr-2005 |
Date work completed: |
31-Aug-2005 |
|
| |
Description: |
Health and Safety works to
pumping stations |
|
| IDB |
Isle of Axholme
IDB |
HEALTH AND SAFETY WORKS
AT PUMPING STATIONS |
15-Mar-05
|
| |
|
|
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
Watercourse: |
N/A |
|
| |
Date work started: |
04-Apr-2005 |
Est. work completion: |
31-Oct-2005 |
|
| |
Description: |
Health and Safety works to
pumping stations |
|
| IDB |
Isle of Axholme
IDB |
HEALTH AND SAFETY WORKS
AT PUMPING STATIONS |
15-Mar-05
|
| |
|
|
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
|
|
|
| |
Date work started: |
04-Apr-2005 |
Date work completed: |
31-Aug-2005 |
|
| |
Description: |
Health and Safety works to
pumping stations |
|
| IDB |
Isle of Axholme
IDB |
HEALTH AND SAFETY WORKS
AT PUMPING STATIONS |
15-Mar-05
|
| |
|
|
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
|
|
|
| |
Date work started: |
04-Apr-2005 |
Est. work completion: |
31-Oct-2005 |
|
| |
Description: |
Health and safety works to
Pumping Stations |
|
| IDB |
Isle of Axholme
IDB |
HEALTH AND SAFETY WORKS
AT PUMPING STATIONS |
15-Mar-05
|
| |
Location: |
Althorpe Village |
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
|
|
|
| |
Date work started: |
04-Apr-2005 |
Date work completed: |
31-Aug-2005 |
|
| |
Description: |
Health and safety works to
pumping stations |
|
| LA |
Weymouth & Portland
Borough Council |
CHESIL COVE - HAND RAIL
TO SEA WALL |
10-Mar-05
|
| |
|
|
Location (EA Region): |
South West |
|
| |
Location (Council): |
Weymouth & Portland Borough
Council |
|
|
|
| |
Date work started: |
01-Mar-2005 |
Date work completed: |
01-Aug-2005 |
|
| |
Description: |
replacing existing
handrail |
|
| LA |
Havant Borough
Council |
SHINGLE RECYCLING,
HAYLING ISLAND |
10-Mar-05
|
| |
|
|
Location (EA Region): |
Southern |
|
| |
Location (Council): |
Havant Borough Council |
|
|
|
| |
Date work started: |
07-Mar-2005 |
Date work completed: |
24-Mar-2005 |
|
| |
Description: |
shingle recycling operation
from areas of accretion outside of the Eastoke frontage to depleted areas along
Eastoke frontage. |
|
| IDB |
LOWER WAVENEY
IDB |
GILLINGHAM PUMP
REPLACEMENT |
04-Mar-05
|
| |
Location: |
Gillingham near Beccles |
Location (EA Region): |
Anglia, Norfolk and Suffolk |
|
| |
Location (Council): |
SOUTH NORFOLK DISTRICT COUNCIL |
Watercourse: |
Gillingham Drain |
|
| |
Date work started: |
25-Oct-2004 |
Date work completed: |
24-Jan-2006 |
|
| |
Description: |
Replacement pumping
station |
|
| LA |
East Devon District
Council |
EXMOUTH SEA WALL :
EMERGENCY WORKS |
28-Feb-05
|
| |
Location: |
Exmouth |
Location (EA Region): |
South West |
|
| |
Location (Council): |
East Devon District Council |
|
|
|
| |
Date work started: |
01-Jan-2004 |
Date work completed: |
15-Nov-2004 |
|
| |
Description: |
1000 tonnes of rock armour
protection to failed length of Beach Gardens Seawall. Re-grouting to the
Seawall. Structural inspections of vulnerable structures. |
|
| LA |
Christchurch Borough
Council |
MUDEFORD SANDBANK BMP
YEAR 4 |
28-Feb-05
|
| |
|
|
Location (EA Region): |
Wessex, Avon and Dorset |
|
| |
Location (Council): |
Christchurch Borough Council |
|
|
|
| |
Date work started: |
07-Mar-2005 |
Date work completed: |
16-Mar-2005 |
|
| |
Description: |
annual recycling of sand under
the agreed BMP.Monitoring of Beach Levels and Environmental monitoring of
scheme activities. |
|
| IDB |
SELBY DRAINAGE BOARD |
SELBY AREA IDB - HEALTH
AND SAFETY WORKS |
25-Feb-05
|
| |
Location: |
AREA AROUND SELBY |
Location (EA Region): |
Yorkshire |
|
| |
Location (Council): |
Selby District Council |
Watercourse: |
VARIOUS IDB DRAINS |
|
| |
Date work started: |
01-Sep-2005 |
Est. work completion: |
30-Apr-2008 |
|
| |
Description: |
HEALTH AND SAFETY WORKS TO
SELBY INTERNAL DRAINAGE BOARD INSTALLATIONS, INCLUDING HANDRAILING, LADDERS,
SECURITY FENCING ETC. |
|
| IDB |
WENT IDB |
NORTON COMMON PUMPING
STATION REFURBISHMENT |
23-Feb-05
|
| |
Location: |
ASKERN |
Location (EA Region): |
Yorkshire |
|
| |
Location (Council): |
Doncaster Borough Council |
Watercourse: |
MAIN DRAIN |
|
| |
Date work started: |
01-Oct-2005 |
Est. work completion: |
30-Sep-2006 |
|
| |
Description: |
REFURBISHMENT OF THE FOUR PUMPS
AND REPLACEMENT OF CONTROL PANELS, WEEDSCREEN CLEANER AND TELEMETRY. |
|
| IDB |
MIDDLE LEVEL
COMMISSIONERS |
ST GERMANS PUMPING
STATION - REPLACEMENT |
17-Feb-05
|
| |
Location: |
MIDDLE LEVEL AREA |
Location (EA Region): |
Anglia, Great Ouse |
|
| |
Location (Council): |
Kings Lynn West Norfolk Borough
Council |
Watercourse: |
MIDDLE LEVEL MAIN DRAIN |
|
| |
Date work started: |
01-Mar-2005 |
Est. work completion: |
01-Mar-2009 |
|
| |
Description: |
REPLACEMENT OF OBSOLETE 4-PUMP
80-CUMEC STATION WITH NEW 6-PUMP 100-CUMEC INSTALLATION 200M DOWNSTREAM
INCLUDING STANDBY GENERATORS AND AUTOMATIC WEEDSCREEN CLEANER. EXISTING
STRUCTURE TO BE DEMOLISHED. |
|
| LA |
Tendring District
Council |
SEAWALL BELOW YORK
ROAD, HOLLAND-ON-SEA |
08-Feb-05
|
| |
Location: |
HOLLAND-ON-SEA, CLACTON, ESSEX |
Location (EA Region): |
Anglia, Essex |
|
| |
Location (Council): |
Tendring District Council |
Watercourse: |
NA |
|
| |
Date work started: |
04-May-2005 |
Date work completed: |
03-Jun-2005 |
|
| |
Description: |
ROCK ARMOUR REVETMENT TO
FAILING SEAWALL |
|
| LA |
West Dorset District
Council |
LYME REGIS
ENVIRONMENTAL IMPROVEMENTS PHASE 2 |
07-Feb-05
|
| |
|
|
Location (EA Region): |
Wessex, Avon and Dorset |
|
| |
Location (Council): |
West Dorset District Council |
|
|
|
| |
Date work started: |
01-Apr-2005 |
Est. work completion: |
30-Apr-2007 |
|
| |
Description: |
coast protection-rock armour
structures,masonary jetties,new sea wall,beach nourishment & cliff
stabilisation. |
|
| LA |
Derby City
Council |
MARKEATON BROOK -
EMERGENCY WORKS |
31-Jan-05
|
| |
Location: |
Derby |
Location (EA Region): |
Severn Trent EA, Upper Trent Area |
|
| |
Location (Council): |
Derby City Council |
Watercourse: |
Markeaton Brook |
|
| |
Date work started: |
09-Aug-2004 |
Date work completed: |
31-Dec-2004 |
|
| |
Description: |
Emergency repair works to 214m
of the markeaton Brook culvert through the city centre suffering imminent
structural collapse. |
|
| IDB |
The Broads
IDB |
HALVERGATE MARSH W. L.
MANAGEMENT SCH. - PH 1 |
25-Jan-05
|
| |
Location: |
HALVERGATE MARSHES IN THE BROADS |
Location (EA Region): |
Anglia, Norfolk and Suffolk |
|
| |
Location (Council): |
Broadland District Council |
Watercourse: |
THE FLEET |
|
| |
Date work started: |
14-Mar-2005 |
Est. work completion: |
07-Dec-2006 |
|
| |
Description: |
AUTOMATE IRRIGATION INLET FROM
TIDAL RIVER WITH WATER LEVEL AND SALINITY MONITORING, ALSO 3 TELEMETRY
INSTALLATIONS, 26 WATER CONTROL STRUCTURES, EMBANK AND RESECTION 7.5KM OF
FEEDER DYKES, PLUS 3 LOW LEVEL CULVERTED DYKE CONNECTIONS |
|
| LA |
Herefordshire
DC |
BROADMEADOWS FAS ROSS
ON WYE EMERGENCY WORKS RUDHALL BROOK |
19-Jan-05
|
| |
Location: |
Ross on Wye |
Location (EA Region): |
Wales (English schemes) |
|
| |
Location (Council): |
Herefordshire DC |
Watercourse: |
Rudhall Brook |
|
| |
Date work started: |
01-Aug-2004 |
Date work completed: |
31-Oct-2004 |
|
| |
Description: |
Emergency replacement of 70m
length of the Rudhall culvert under Greytree Road. |
|
| IDB |
NORTH LEVEL
IDB |
POPLARS PUMPING STATION
REFURBISHMENT |
12-Jan-05
|
| |
Location: |
Tydd St Giles north of Wisbech |
Location (EA Region): |
Anglia, Welland and Nene |
|
| |
Location (Council): |
Fenland District Council |
Watercourse: |
Treading Drain |
|
| |
Date work started: |
14-Apr-2005 |
Date work completed: |
17-Jan-2006 |
|
| |
Description: |
Refurbishment of pumps and
electric motors, replacement of electrical control panels |
|
| IDB |
TWEEN BRIDGE IDB |
ELMHIRST PUMPING
STATION |
23-Dec-04
|
| |
Location: |
TWEEN BRIDGE MOORS, THORNE, S YORKS |
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
Doncaster Borough Council |
Watercourse: |
THORNE WASTE DRAIN |
|
| |
Date work started: |
01-Apr-2005 |
Est. work completion: |
31-May-2006 |
|
| |
Description: |
REFURBISH 2 ARCHIMEDIAN
PUMPS,INC MOTORS AND AUTOMATIC WEED SCREEN CLEANER,PLUS NEW CONTROL
PANEL,CONCRETE TO SSP WALLS OF OUTFALL SUMP, H&S WORK TO FENCING AND
PROVIDE TELEMETRY, ALSO REPLACE INVERTED SYPHON ON LEONARD'S DRAIN |
|
| LA |
Derby City
Council |
MARKEATON &
MACKWORTH BROOK AND NORTHERN FLOOD CUL - PHASE 1 |
22-Dec-04
|
| |
Location: |
DERBY CITY |
Location (EA Region): |
Severn Trent EA, Upper Trent Area |
|
| |
Location (Council): |
Derby City Council |
Watercourse: |
MARKEATON BROOK & NORTHERN FLOOD
CULVERT |
|
| |
Date work started: |
01-Jan-2005 |
Est. work completion: |
31-Mar-2006 |
|
| |
Description: |
REFURBISHMENT OF STILLING
PONDS, FLOW DIVERSION WEIRS AND SCREENS. REPAIR OF MARKEATON BROOK CULVERT.
REPAIR/REPLACEMENT OF SECTION OF NORTHERN FLOOD CULVERT. |
|
| LA |
Teignbridge District
Council |
EMERGENCY WORKS
TEIGNMOUTH POINT CAR PARK |
21-Dec-04
|
| |
Location: |
Teignmouth |
Location (EA Region): |
South West |
|
| |
Location (Council): |
Teignbridge District Council |
|
|
|
| |
Date work started: |
01-Mar-2003 |
Date work completed: |
01-Apr-2003 |
|
| |
Description: |
Removal of existing failing
concrete toe protection to Point Car Park retaining wall. Casting of new
reinforced concrete toe & repair of cracks in retaining wall. Length of
works 55m |
|
| IDB |
UPWELL
IDB |
BEDLAM PUMPING STATION
- PUMP REPLACEMENT |
17-Nov-04
|
| |
Location: |
UPWELL FEN, CAMBRIDGESHIRE |
Location (EA Region): |
Anglia, Great Ouse |
|
| |
Location (Council): |
Fenland District Council |
Watercourse: |
SIXTEEN FOOT DRAIN |
|
| |
Date work started: |
01-Jul-2005 |
Est. work completion: |
30-Sep-2006 |
|
| |
Description: |
FAILING DIESEL DRIVEN PUMP IN
TWO UNIT STATION TO BE REPLACED WITH ELECTRIC PUMP OF SAME CAPACITY. ALSO,
REPLACE SWITCH-GEAR WITH UPDATED ELECTRIC CONTROLS PLUS MODIFICATIONS TO INTAKE
SUMP. |
|
| IDB |
LINDSEY MARSH
IDB |
TELEMETRY SYSTEM
UPGRADE 2004/2005 |
17-Nov-04
|
| |
Location: |
Large low-lying area within East Lindsey
DC |
Location (EA Region): |
Anglia, Lincolnshire |
|
| |
Location (Council): |
East Lindsey District Council |
|
|
|
| |
Date work started: |
03-Feb-2005 |
Est. work completion: |
30-Sep-2005 |
|
| |
Description: |
Improvements to the telemetry
system which controls the operating system for the Board's 30 land drainage
pumping stations |
|
| LA |
East Devon District
Council |
SIDMOUTH BMP YEAR 4
(2004/05) |
02-Nov-04
|
| |
Location: |
sidmouth |
Location (EA Region): |
South West, Devon |
|
| |
Location (Council): |
East Devon District Council |
|
|
|
| |
Date work started: |
01-Apr-2004 |
Date work completed: |
31-Jan-2005 |
|
| |
Description: |
5 years of beach monitoring
surveys, which will determine the need for any periodic recycling or
nourishment of beach material in accordance with the agreed beach management
plan |
|
| LA |
East Devon District
Council |
SIDMOUTH BMP YEAR 3
(2003/04) |
02-Nov-04
|
| |
Location: |
sidmouth |
Location (EA Region): |
South West, Devon |
|
| |
Location (Council): |
East Devon District Council |
|
|
|
| |
Date work started: |
01-Apr-2003 |
Date work completed: |
01-Apr-2004 |
|
| |
Description: |
the work will consist of 5
years of beach monitoring surveys which will determine the need for any
periodic recycling or nourshment of beach material in accordance with the
agreed bmp |
|
| LA |
Torbay Borough
Council |
PAIGNTON TOWN CENTRE
FLOOD ALLEVIATING SCHEME |
20-Oct-04
|
| |
Location: |
PAIGNTON |
Location (EA Region): |
Wessex, Avon and Dorset |
|
| |
Location (Council): |
Torbay Borough Council |
Watercourse: |
VICTORIA STREAM |
|
| |
Date work started: |
03-Jan-2006 |
Est. work completion: |
30-Jun-2006 |
|
| |
Description: |
PROVISION OF A NEW PUMPING
STATION TO ALLOW VICTORIA STREAM TO DISCHERGE INTO PAIGNTON HARBOUR AGAINST ALL
TIDE LEVELS TOGETHER WITH HYDRAULIC UPSIZING OF VARIOUS CULVERTS IN THE
DRAINAGE SYSTEM. |
|
| LA |
Tonbridge & Malling
Borough Council |
EAST PECKHAM FLOOD
RELIEF SCHEME |
18-Oct-04
|
| |
|
|
Location (EA Region): |
Southern, Kent |
|
| |
Location (Council): |
Tonbridge & Malling Borough
Council |
Watercourse: |
Coult Stream |
|
| |
Date work started: |
01-Jun-2005 |
Est. work completion: |
30-Nov-2005 |
|
| |
Description: |
Construction of an earth
embankment flood defence dam to retain 40,000m3 of floodwater, excavation of a
borrow pit to be retained as a pond and teh excavation of a flood relief
channel to bypass an under capacity culvert. |
|
| LA |
Southend-on-Sea Borough
Council |
TWO TREE ISLAND DEFENCE
IMPROVEMENTS |
24-Sep-04
|
| |
Location: |
Southend |
Location (EA Region): |
Anglia, Essex |
|
| |
Location (Council): |
Southend-on-Sea Borough Council |
Watercourse: |
N/A |
|
| |
Date work started: |
11-Jul-2005 |
Est. work completion: |
31-Oct-2005 |
|
| |
Description: |
To improve the existing
defences along the south and northeast frontages of Two Tree Island to reduce
the risk ofthe release of domestic and industrial landfill waste into the
surrounding tidal areas (SPA, RAMSAR etc) |
|
| IDB |
MARCH FIFTH
DDC |
SOUTH CREEK PUMPING
STATION - REPLACEMENT PUMP |
27-Aug-04
|
| |
Location: |
MARCH, CAMBRIDGESHIRE |
Location (EA Region): |
Anglia, Great Ouse |
|
| |
Location (Council): |
Fenland District Council |
Watercourse: |
OLD RIVER NENE |
|
| |
Date work started: |
01-Jun-2005 |
Est. work completion: |
31-Oct-2005 |
|
| |
Description: |
FAILING UNDERSIZED PUMP IN
SINGLE UNIT STATION TO BE REPLACED WITH PUMP OF DOUBLE CAPACITY PLUS UPRATED
SWITCH-GEAR AND OTHER IMPROVEMENTS TO STATION STRUCTURE INCLUDING DOUBLE WIDTH
WEEDSCREEN |
|
| LA |
Havant Borough
Council |
BEACH
RECYCLING2003,EASTOKE,HAYLING ISLAND.EMERGENCY |
26-Aug-04
|
| |
|
|
Location (EA Region): |
Southern, Hampshire & Isle of
Wight |
|
| |
Location (Council): |
Havant Borough Council |
|
|
|
| |
Date work started: |
01-Oct-2003 |
Date work completed: |
31-Mar-2004 |
|
| |
Description: |
shingle recycling operation
from areas of accreation outside of the Eastoke frontage to depleted areas
along the Eastoke frontage |
|
| LA |
Redcar and Cleveland
Council |
SKINNINGROVE COASTAL
DEFENCE WORKS |
18-Aug-04
|
| |
|
|
Location (EA Region): |
Northumbria |
|
| |
Location (Council): |
Redcar and Cleveland Council |
Watercourse: |
Kilton/Skinninggrove Beck |
|
| |
Date work started: |
15-Jul-2005 |
Date work completed: |
15-Sep-2005 |
|
| |
Description: |
Widening & reconstruction
of Beck Training Works at Skinninggrove. Work to include constr of 26m rock
spur adj to car park and erosion protection works upstream of the beach road
bridge |
|
| IDB |
RAMSEY,UPWOOD &
GREAT RAVELEY IDB |
NEW FEN PUMPING STATION
- REPLACEMENT PUMP |
05-Aug-04
|
| |
Location: |
NEW FEN, RAMSEY, CAMBS |
Location (EA Region): |
Anglia, Great Ouse |
|
| |
Location (Council): |
Huntingdonshire District Council |
Watercourse: |
RIVER NENE OLD COURSE |
|
| |
Date work started: |
01-Nov-2004 |
Est. work completion: |
30-Sep-2005 |
|
| |
Description: |
FAILING DIESEL PUMP IN TWO-UNIT
STATION TO BE REPLACED WITH ELECTRIC PUMP OF SIMILAR CAPACITY, ALSO DEMOLISH
UNSAFE BUILDING AND REPLACE TO HOUSE UPDATED SWITCHGEAR PLUS OTHER IMPROVEMENTS
TO STATION STRUCTURE |
|
| IDB |
WEST MENDIP IDB |
WATER CONTROL
STRUCTURES - HEALTH AND SAFETY WORKS |
02-Aug-04
|
| |
|
|
Location (EA Region): |
Wessex, Somerset |
|
| |
Location (Council): |
Defunct Woodspring |
Watercourse: |
IDB VIEWED RHYNES |
|
| |
Date work started: |
01-Aug-2004 |
Est. work completion: |
31-Mar-2007 |
|
| |
Description: |
HEALTH AND SAFETY IMPROVEMENT
WORKS TO 30No WATER CONTROL STRUCTURES AND REMOVAL OF 17No REDUNDANT
STRUCTURES. ACCESS FOR OPERATION OF WATER CONTROL BY MODIFIED TIMBER
FOOTBRIDGES. |
|
| IDB |
SELBY DRAINAGE BOARD |
SELBY DAM PUMPING
STATION IMPROVEMENT WORKS |
27-Jul-04
|
| |
Location: |
SELBY AND AREAS WITHIN THE SELBY IDB
CATCHMENT |
Location (EA Region): |
Yorkshire |
|
| |
Location (Council): |
Selby District Council |
Watercourse: |
SELBY DAM |
|
| |
Date work started: |
27-Oct-2000 |
Est. work completion: |
31-Mar-2006 |
|
| |
Description: |
1. REFURBISHMENT OF PUMPS TO
5.0m3/S. 2. NEW WEEDSCREEN CLEANER AND ASSOCIATED WORK. 3. STANDBY GENERATOR
AND FLOODWALL. NB: FLOODWALL DELETED PENDING OUTCOME OF DISCUSSIONS BETWEEN
EA/IDB ON THIS ITEM. |
|
| IDB |
NORTH LEVEL
IDB |
MOUTH LANE PUMPING
STATION REFURBISHMENT |
27-Jul-04
|
| |
Location: |
MARSHES SOUTH AND EAST OF WISBECH ST
MARY |
Location (EA Region): |
Anglia, Welland and Nene |
|
| |
Location (Council): |
Fenland District Council |
Watercourse: |
TIDAL RIVER NENE |
|
| |
Date work started: |
09-Aug-2004 |
Date work completed: |
12-Jul-2005 |
|
| |
Description: |
REPLACEMENT OF FAILURE PRONE
ELECTRICAL SWITCHGEAR PANELS AND WIRING TO ELECTRIC PUMP IN A 2-PUMP
ELECTRIC/DIESEL STATION, INCLUDING REFURBISHMENT OF ELECTRIC MOTOR AND PUMP
UNIT, PLUS UPGRADE TELEMETRY. |
|
| IDB |
LOWER OUSE
IDB |
SALTMARSHE & LAXTON
CLOUGH TRAINING WALLS REPLACEMENT SCHEME |
26-Jul-04
|
| |
Location: |
CATCHMENT AREAS OF SALTMARSHE AND
LAXTON |
Location (EA Region): |
Yorkshire |
|
| |
Location (Council): |
East Riding of Yorkshire |
Watercourse: |
TIDAL RIVER OUSE |
|
| |
Date work started: |
16-Mar-2005 |
Date work completed: |
01-Sep-2005 |
|
| |
Description: |
REPLACEMENT OF SALTMARSHE AND
LAXTON DRAINS TRAINING WALLS TO THE TIDAL STRUCTURES WITH SHEET PILED WALLS.
MAINTENANCE OF THE CLOUGHS AND MAIN RIVER FLOOD DEFENCES WILL CONTINUE. |
|
| IDB |
SNAITH DB |
SNAITH IMPROVEMENT
WORKS - LORD DOWNES CLOUGH PUMP STATION |
22-Jul-04
|
| |
Location: |
DISTRICTS WITHIN THE SNAITH DRAINAGE BOARD
AREA |
Location (EA Region): |
Yorkshire |
|
| |
Location (Council): |
East Riding of Yorkshire |
Watercourse: |
RIVER AIRE |
|
| |
Date work started: |
01-Apr-2005 |
Est. work completion: |
30-Sep-2007 |
|
| |
Description: |
WORKS TO MAINTAIN FLOOD
PROTECTION AND ADDRESS H+S ISSUES [PUBLIC ACCESS AND SAFETY]. MODERNISATION OF
ELECTRICAL SWITCHGEAR AND WEED SCREEN AND REPAIRS TO SNAITH DB'S ASSETS. SNAITH
DB IS SUBJECT TO FLUVIAL AND TIDAL FLOODING. |
|
| IDB |
ANCHOLME IDB |
CADNEY PUMPING STATION
REPLACEMENT |
20-Jul-04
|
| |
Location: |
Cadney near Brigg |
Location (EA Region): |
Anglia, Lincolnshire |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
Watercourse: |
Newstead Drain |
|
| |
Date work started: |
20-Jul-2004 |
Est. work completion: |
31-Mar-2006 |
|
| |
Description: |
New pumping station to replace
existing station built 1948 |
|
| IDB |
MESSINGHAM IDB |
EAST BUTTERWICK PUMPING
STATION |
20-Jul-04
|
| |
Location: |
East Butterwick near Scunthorpe |
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
Watercourse: |
West Common North Drain |
|
| |
Date work started: |
01-Jan-2005 |
Date work completed: |
01-Feb-2006 |
|
| |
Description: |
Refurbishment of existing PS
including the renewal of pumps control panel, penstock flap valves and tidal
doors |
|
| IDB |
SCUNTHORPE IDB |
FLIXBOROUGH PUMPING
STATION |
20-Jul-04
|
| |
Location: |
Flixborough Industrial Estate |
Location (EA Region): |
Severn Trent EA, Lower Trent Area |
|
| |
Location (Council): |
NORTH LINCOLNSHIRE COUNCIL |
Watercourse: |
NA |
|
| |
Date work started: |
01-Apr-2005 |
Est. work completion: |
31-Mar-2006 |
|
| |
Description: |
Replacement of 450mm diamete
pipeline with new 1200mm dia together with renewal of pumps and controls |
|
| IDB |
BLACK SLUICE
IDB |
REFURBISHMENT OF
SEMPRINGHAM FEN PUMPING STATION |
15-Jul-04
|
| |
Location: |
Villages of Sempringham and Pointon near
Bourne |
Location (EA Region): |
Anglia, Lincolnshire |
|
| |
Location (Council): |
NORTH KESTEVEN DISTRICT COUNCIL |
Watercourse: |
Sempringham Pumped Drain |
|
| |
Date work started: |
16-Jul-2004 |
Date work completed: |
01-Dec-2004 |
|
| |
Description: |
Refurbish pump amd electrical
motor, replace control panel together with other health and safety works |
|
| IDB |
BLACK SLUICE
IDB |
REFURBISHMENT OF
QUADRING FEN PUMPING STATION |
15-Jul-04
|
| |
Location: |
Properties in Quadring Fen |
Location (EA Region): |
Anglia, Lincolnshire |
|
| |
Location (Council): |
South Holland District Council |
Watercourse: |
Quadring Pump Drain |
|
| |
Date work started: |
16-Jul-2004 |
Date work completed: |
01-Mar-2005 |
|
| |
Desc | |